PROJECT DATA QUESTIONNAIRE

Name*
Company*
Address*
City*
State/Province*
Zip Code*
Country*
Phone*
Fax*
e-mail*

(* Required)

TYPE OF WORK TO BE PERFORMED: (Choose all that apply.)

Please give a brief description and the geographic location of the work to be performed.

PROJECT INFORMATION - DESCRIPTION OF MATERIAL:

Sand and Gravel Clay Vegetation
Gravel - Over 6-inch % Hard Roots - Heavy
Gravel - 3-inch to 6-inch % Plastic Roots - Light
Gravel - 1-inch to 3-inch % Soft Stumps - Logs
Gravel - Less than1-inch % Sticky Mangroves
Sand - Coarse % Mixed with Sand  
Sand - Medium % Mixed with Gravel  
Sand - Fine %    

Describe any other characteristics of material, such as peat, trash, coral, maximum rock size, chemical qualities, etc.:

Specific Gravity of dry solids:

OUTPUT REQUIRED:

Cubic Yards
Cubic Meters

Total Size of Project:
Annual Production Required:
Operational Hours Per Day:
Operational Days Per Week:
Operational Weeks Per Year:
Net Hourly Production Required:

Describe any unusual conditions that may influence annual output:

PUMPING CONDITIONS:

Feet Meters

  Maximum Minimum Normal
Total Length of Pipeline:
Length of Floating Pipeline:
Length of Shore Pipeline:
Static Lift to Discharge Point:
Dredging Depth:
Width of Cut:
Height of Bank above Bottom of Cut:
Elevation (Above Sea Level):
Air Temperature During Operation
Fahrenheit Celsius

GENERAL DREDGING CONDITIONS:

Water

  Continuously Frequently Infrequently
Calm Water:      
Rough Water:      
Windy      
Stormy      
Currents, 2 - 5 Knots:      
Currents, Over 5 Knots:      
Waves, 3 - 5 Feet      
Waves, Over 5 Feet      
Swells, 3 - 5 Feet      
Swells, Over 5 Feet      

Is sheltered water accessible in case of storms?

LIMITATIONS

Please describe any limitations as to Allowable Draft, Overhead Clearance, Equipment Length or Breadth During Operation, Shipping Sizes, or Shipping Weights.

ADDITIONAL COMMENTS

Please provide us with any additional information about your dredging project.